Replacement of existing plumbing fixtures over existing roughing with new fixtures in existing locations. no change to layouts, configuration, use, egress, or occupancy.
This Plumbing Application is a Subsequent Filing. The work, including costs, were included in the scope of Initial Project Filing. This is to clarify that the 3 fixtures in the new…
plumbing modification associated with apartment renovation
Filing for the plumbing in conjunction with the renovation work to combine apartments 27A and 27B.
Associated Plumbing work with GC application to replace existing due to water damage
Renovate existing apartment 9b master & guest bathrooms: replace 2 lav's., 2 toilets, 1 tub. remove 1 tub and new 1 shower in same location as per plans filed.no change in use, egr…
Pl fixtures filed in 9d filed in conjunction with dob now pl. no change to use, occupancy or egress.
Alt application for interior renovation of an existing commercial retail space in cellar and on first floor. plumbing work as per plans filed herewith. no change of use, occupancy…
Plumbing work in conjunction with the renovation of existing commercial space on the 001 floor. No change in use, occupancy or egress.
plumbing work to the existing 1 family house-all work as per the plans submitted. no change to use, egress or occupancy. plumbing in conjunction with the main application # B011676…
Plumbing work in two family house as per plans. no change in use,bulk, occupancy or egress.
Minor plumbing in existing commercial space on the 5th floor.
Renovation of existing apartment #3w. plumbing work. no change of use, occupancy or egress.
Installation of new plumbing fixtures on 1st floor. No change in use, egress or occupancy is involved.
Propose plumbing works being performed in conjunction with gc job#b01311513-i1 and ms job#b01311513-s2. no change in use, egress, or occupancy is proposed under this application
Plumbing work related to the interior renovation of apartment 2a on the second floor. no change in use, egress, or occupancy.
Modifications to the existing plumbing system in basement (Le Cafe) as per plans. No change to use, egress or occupancy.
Plumbing work in conjunction with the miscellaneous interior renovation of an existingresidential unit 35p on the 35th floor of an existing mixed residential & commercial (rm) buil…
Filling to address open nyc dob violations and swo provide plans to clear stop work order and to address violation. no change in use, egress and occupancy