Owners Gc Ny Llc
Permits (72)
Proposed alteration from a 2 story building to a 4 story penthouse residential building total of 22 dwelling units.
Super structure work in conjunction to the ALT-CO application #X01192568-I1
PAA filed to amend drawings
Proposed alteration from a 2 story building to a 4 story penthouse residential building total of 22 dwelling units.
Support of Excavation work in conjunction to the ALT-CO application #X01192568-I1
Foundation/Earthwork work in conjunction to the ALT-CO application #X01192568-I1
Mechanical work in conjunction to the ALT-CO application #X01192568-I1
Super structure work in conjunction to the ALT-CO application #X01192568-I1
Install construction fence in conjunction with alteration application.
PAA filed to amend drawings
Foundation plans filed for a new ramp
Foundation plans filed for a new ramp
Foundation specifications filed in conjunction with gc application job #b01193907-i1
Underpinning specifications filed in conjunction with gc application job #b01193907-i1
Mechanical application filed herewith in conjunction to alt-co application x01243324-i1
Structural application filed in conjunction to the alteration co application
Mechanical application filed herewith in conjunction to alt-co application x01243324-i1
Proposed support of excavation work filing #b01264675-s2 in conjunction with g/c filing #b01264675-i1
Proposed support of excavation work filing #b01264675-s2 in conjunction with g/c filing #b01264675-i1
Proposing an alteration to the existing 2 story to 4 stories and penthouse.to a total of nine (9) class a dwelling units.