Rem: 2 sp heads, rel: 11 sp heads & install 6 new sp heads & piping on 1st floor. rem: 5 sp heads, rel: 20 sp heads & install 6 new sprinkler heads & piping on mezzanine level.
Modification to sprinkler system as per plans.
BMH SP Carrington Pav: Sprinkler modifications within the existing Hospital as per plans filed herewith. No change to zoning, use or egress
Modifications to the existing Sprinkler System: Remove (360) existing sprinkler heads and Install (654) new sprinkler heads and associated piping on the 8th Floor as per plans (Mor…
Sprinkler work on the 3rd floor as plans filed herewith. no change in use, egress, or occupancy.
Installation of new sprinkler heads and related piping. No change in use, egress or occupancy.
Hereby filing to remove and install sprinkler heads with related piping for office fitout as shown on plans filed herewith. No change to use, occupancy or egress.
Sprinkler work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.
hereby filing to remove and install sprinkler heads with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to modify the standpipe and remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or…
Sprinkler work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.
Additions/modifications to existing plumbing/sprinkler fixtures as per plans filed herewith.
Installation of a new sprinkler system on the 37th and 39th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
Installation of new fire hose cabinet on the 37th & 39th floors (ARES) as per plans. No change to use, egress or occupancy.
Modifications to SP system and related piping for existing office space. No change in use, egress or occupancy.
Modifications to the existing Standpipe System: Installation of (2) new Fire Hose Cabinets and associated SD piping on the 5th Floor as per plans (MUFG Office Renovations.) No chan…
LMH AC 1 & 2: Plumbing and sprinkler modifications to accommodate replacement of hvac equipment and roof as per plans
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.