Par Fire Protection Llc
Permits (111)
Plumbing and sprinlker work in conjunction with interior renovation of commercial space on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Modifications of an existing sprinkler system.
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Sprinkler modifications as per plans filed herewith. No change to use, egress or occupancy.
Sprinkler modifications as indicated on the plans filed herewith. no change in use, egress or occupancy
Sprinkler modifications as indicated on the plans filed herewith. no change in use, egress or occupancy
Sprinkler work on the 6th floor as indicated on drawings.
Modifications to the existing Standpipe System; Relocation of two (2) Fire Hose Rack and Fire Hose Valves and associated Fire Standpipe on the 3rd Floor as per plans (Wafra Inc. - Office Renovation.)...
Herewith filing for sprinkler modifications in conjunction w/ 6th flr chem lab renovations per plans.
Sprinkler work on the 6th floor as indicated on drawings.
Modifications to the existing Standpipe System; Relocation of two (2) Fire Hose Rack and Fire Hose Valves and associated Fire Standpipe on the 3rd Floor as per plans (Wafra Inc. - Office Renovation.)...
Herewith filing for sprinkler modifications in conjunction w/ 6th flr chem lab renovations per plans.
Sprinkler modifications to accommodate IDF equipment room on the 14th floor in the existing Memorial Hospital building including work on floors 12 and 15. All work as per plans filed herewith.
Sprinkler modifications to accommodate IDF equipment room on the 14th floor in the existing Memorial Hospital building including work on floors 12 and 15. All work as per plans filed herewith.
Modification of sprinkler system as shown on plans
Modification of sprinkler system as shown on plans
Install (38) new heads, (1) jockey & (1) booster pump on the Cellar, (33) heads on the 1st Floor, (25) heads on the 2nd Floor, (48) heads on the 3rd Floor and associated Sprinkler Piping (Project Ruby...
Install (38) new heads, (1) jockey & (1) booster pump on the Cellar, (33) heads on the 1st Floor, (25) heads on the 2nd Floor, (48) heads on the 3rd Floor and associated Sprinkler Piping (Project Ruby...
Installation of new sprinkler heads and piping on Floors 33, 34, 35, 36 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy.
Installation of new sprinkler heads and piping on Floors 33, 34, 35, 36 (Kirkland & Ellis) as per approved plans. No change to use, egress or occupancy.