Filing Plumbing application for the removal and replacement of plumbing fixtures as per plans herewith for the 3rd and 4th floors.
Filing for Plumbing and Sprinkler work in conjunction with a new building B08050740-I1. Sprinkler work to include 12 pre-action sprinkler heads and 41 saltwater heads for the saltw…
Filing herewith plumbing removal work as per plans filed herewith. (39th to 42nd FL. Construction FL., 41st to 44th Marketing FL.) No change to use, egress or occupancy.
Modification to existing plumbing systems and installation of new sprinkler system as per plans filed herewith. Installation of new plumbing fixtures and new sprinkler heads. No ch…
Demo/install of new acid waste system and related piping, tanks + equipment. sprinkler heads tb removed/relocated and installed as per plans. no change in use, egress or occupancy.
Mechanical work filed in conjunction with new building application number 322085417
Description of Plumbing work to be completed Relocating plumbing lines to accommodate new partitions. Modifying heads to accommodate new partitions. Creating new bypass loops at th…
Provide new elevator sump pumps in existing elevator shafts, indirectly connect the discharge of new elevator sump pump to existing combined sanitary & storm sewer. Route new conde…
Plumbing fixture build out for tenant museum space. Filed in conjunction with HUB NB #210179929. (Hub consultation 9/5/24. S Pavan Ok to assign to S Linehan examiner)
Modification to existing Sprinkler System and Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
LMH AC 1 & 2: Plumbing and sprinkler modifications to accommodate replacement of hvac equipment and roof as per plans
Filing plans herewith for plumbing modifications to replace existing gas piping for new utility meter installation. No change to use, egress, or occupancy.
Minor plumbing modification as per plans. no change in use, egress or occupancy.
Installation of new Plumbing fixtures and modifications to Sprinkler Systems as per plans filed herewith for 49th floor (Construction), 69th floor (Marketing). No change in use, eg…
Plumbing Modifications taking place on the 21st floor as indicated on the drawings.
Plumbing modifications taking place on the 20th floor as indicated on the drawings.
Removal of plumbing work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Removal, replacement and installation of new plumbing fixtures and associated CW/sanitary piping on the 17-18th Floors as per plans (Lowenstein Sandler LLP - Office Renovations.) N…
Interior plumbing work as shown herewith. no changes to egress, occupancy or use.
Plumbing work as shown herewith. no changes to egress, occupancy or use.