Installation of industrial rope access for facade and local law inspection
Installation of shoring system for elevation o as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this applicat…
Terracotta anchorage design facade replacement as per plans filed herewith. No change in use egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Herewith filing repair of damaged masonry, steel, wood and concrete conditions per plans. no change in use, occupancy or egress under this application.
Facade repairs as per plans filed herewith. no change to use, egress or occupancy
Proposed 7-Story New Affordable Housing Building Application.
Herewith filing masonry repairs per plans. no change in use, occupancy or egress under this application.
Herewith filing for repair of damaged masonry and wood conditions per plans. no change in use, occupancy or egress under this application.
Herewith filing repair of damaged steel, concrete and masonry conditions per plans. no change in use, occupancy or egress under this application.
Herewith filing repair of damaged masonry per plans. no change in use, occupancy or egress under this application.
Brick replacement, terra cotta stone replacement, concrete coping replacement, steel lintel replacement, steel repairs, cornice replacement at roof with gfrc at south facade
Installation of suspended scaffold for facade work or inspection
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy.
Renewal of SR23/1505
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added anchor wall detail
alteration to add multiple stories to existing 4 story building. P2-Amend pw1 and drawings
Installation of shoring system as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.