Renewal of SR23/1505
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added anchor wall detail
alteration to add multiple stories to existing 4 story building. P2-Amend pw1 and drawings
Installation of shoring system as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Filing herewith structural work in conjunction with building renovation as per plans.
Suspended scaffold outrigger system at 1260 broadway, manhattan for exterior facade restoration work.
Creation from existing lower level duplex apartment to new laundry room as shown on drawings filed herewith. No change to egress or bulk.
Installation of suspended scaffold for facade work or inspection.
General construction work as shown on plans