Installation of 7000 lb dual personnel hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress, or occupancy unde…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of 300 psf sidewalk shed and construction fence as per plans. all equipment shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy…
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress o…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Installation of sidewalk shed as per plans. sidewalk shed live load 300 psf shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy under this applicat…
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.