Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applicatio
Installation of system stair tower as per plans. system stair tower shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of 300psf sidewalk shed, construction fence and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or…