Remove (2) sprinkler heads and associated piping in room 336. branch off feeding demolished space shall be rerouted to accomodate relocated sprinkler heads as per new room layout.
Installation of new sprinkler system as indicated on the drawings filed herein in conjunction with job # X08036111-I1
Installation of sprinkler system as shown on plans submitted herewith in conjunction with b01189197-i1.
Installation of sprinkler system for a 4-family residential building in conjunction with b01185141-i1.
Proposed automatic sprinkler system as per plan. in conjunction with dob alt-co-new building job # b01076906-i1.no change in use, bulk, egress or occupancy.
Filing sprinkler application to reflect new sprinkler heads as per plans filed. no change to use, egress or occupancy.
Installation of sprinkler system as shown on plans submitted herewith in conjunction with b01183620-i1.
Pre-tenant work-- modifications to existing sprinkler system in conjunction with demo/bathroom fitout. install tcsp as per plans.
Sprinkler miodification at sub-cellar#2 and sub-cellar#1. no change to use occupancy or egress.
Installation of sprinkler system in conjunction with b01231274-i1.
Installation and modification sprinklers system for an eating and drinking establishment at partial 1st floor existing commercial space as per plan. No change in use, egress, or oc…
Installation of sprinkler system for a 4-story, 4-family building in conjunction with b01132987-i1.
Modification to existing Sprinkler system as per plans filed herewith
Installation of sprinkler system as shown on plans submitted herewith in conjunction with b01267158
Insallation of mechanical system for a 4-story 1-family dwelling in conjunction with b01195637-i1
Filing of plumbing and fire sprinkler plans in conjunction with nb application #: 322034801.
Installation of sprinkler system for a 5-story, 1-family dwelling in conjunction with b01045453-i1.
Sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Modify wet sprinkler system for coverage on the entire project.
Insatllation of 2 new sprinklers inside single bathrooms 204a and 206a. provide new branch-off pipe from existing main.