Installation of new fire hose cabinet on the 43rd & 44th floors(ARES) as per plans. No change to use, egress or occupancy.
Modification to the existing sprinkler system on the 43rd & 44th floors (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
Hereby filing to remove, relocate and install sprinkler heads with related piping in retail space as shown on plans filed herewith.
Herewith filing for modification of existing sprinkler system on the 6th floor as per the drawings. No change in use, egress or occupancy.
Modify sprinkler heads and related piping. No change in use, egress or occupancy.
Sprinkler/Plumbing modifications as per plans filed herewith. No change to use, egress or occupancy.
Modification of existing sprinkler system as per plans filed herewith. Filed in conjunction with ALT-CO M01289779-I1.
Sprinkler work as shown on plans
Standpipe work as shown on plans
Standpipe work as shown on plans filed herewith.
Sprinkler work as shown on plans filed herewith.
Installation of a new sprinkler system on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
Installation of new fire hose cabinet on the 31st floor (ARES) as per plans. No change to use, egress or occupancy.
Installation of two fire hose cabinets and related piping. No change in use, egress or occupancy.
Herewith filing for sprinkler/ standpipe modifications as per plans. no change in use, egress or occupancy.
Filing herewith for sprinkler relocation as per plans filed herewith