Sprinkler modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Application filed for sprinkler additions/modifications on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Hereby filing to install sprinkler heads with related piping for office reno as shown on plans filed herewith. No change to use, occupancy or egress.
Sprinkler work from the 3rd floor to 5th floor as plans filed herewith. no change in use, egress, or occupancy.
Sprinkler work from the 3rd to the 5th floors as plans filed herewith. no change in use, egress or occupancy.
Sprinkler changes on the 7th, 8th & 9th floors as indicated on drawings.
Modification/addition to sprinkler system and related piping and installation of Temporary Core Sprinkler protection as shown on drawings. No change in use, egress or occupancy.
Modifications to existing sprinkler system on 12th floor (north) per plans. No change to use, egress or occupancy.
Sprinkler head changes as indicated on plans.
Installation of fire house cabinet as per plans submitted herewith.
Standpipe work for dental center and members lobby as per plans filed herewith. no change to use, egress or occupancy.
Sprinkler work to dental center and members lobby as per plans filed herewith. no change to use, egress or occupancy.