Replacement of: existing vacuum pump and connections; control valve and by-pass valve system; steam piping to existing DHWH. Installation of temp. condensate pump-Installation of f…
NYCHA Sumner BOILER-BLDG #12- Civil work being filed for repair to existing Mechanical room correspondent to the Sumner BL Houses Project.
NYCHA Sumner BOILER-BLDG #12- Structural Work filed to provide steel reinforcing for new louver opening on non-load bearing masonry wall or foundation wall. Provide interior concre…
Civil work related to surface restorations, concrete and pavement cutting, sheeting and shoring associated with existing tank removal, protection of trees and shrubs.Tree replaceme…
Provide steel reinforcing for new louver opening on non-load-bearing masonry wall or foundation wall. Provide interior concrete pad for MEP equipment. Provide outdoor flue and clad…
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…
new trenching for underground gas lines installed by utility company between existing building and restorations of new excavations.
NYCHA Sumner BOILER-BLDG #12- Mechanical Work filed for Replacement of existing vacuum pump & connections, control valve & by-pass valve system. Removal of steam piping to existing…
NYCHA Sumner BOILER-BLDG #12- Architectural work being filed for interior repair to existing Mechanical room correspondent to the Sumner BL Houses Project
Filing for the temporary installation of bracing in conjunction with M00584241-S2 as per plans filed herewith.
Filing herewith general construction and structural in Electrical and VFD Control Room improvements (to address new equipment located there and, on the roof above-Main Building). N…
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.