Filing for the temporary installation of bracing in conjunction with M00584241-S2 as per plans filed herewith.
Filing herewith general construction and structural in Electrical and VFD Control Room improvements (to address new equipment located there and, on the roof above-Main Building). N…
BLDG#7_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#8_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#9_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
installation of new mechanical supporting equipment, duct and piping for 3 new boilers to be installed as per plans.
Provide services to support Mechanical equipment removals and new installations
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…