installation of new mechanical supporting equipment, duct and piping for 3 new boilers to be installed as per plans.
Replacement of HVAC equipment (Vacum pump, condensate pump)
NYCHA BOILER_BLDG#12_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#3_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Renovation of cellar mechanical rooms - nycha boilers
BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Renovation and replacement of HVAC equipment at cellar mechanical room as shown on the drawings provided.