BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
BLDG#3_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Renovation of cellar mechanical rooms - nycha boilers
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
NYCHA BOILER_BLDG#12_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Renovation and replacement of HVAC equipment at cellar mechanical room as shown on the drawings provided.