BLDG#2_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the building.
Renovation of cellar mechanical rooms - nycha boilers
Renovation and replacement of HVAC equipment at cellar mechanical room as shown on the drawings provided.
BLDG#3_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
BLDG#6_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
NYCHA BOILER_BLDG#12_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
BLDG#4_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
Installation of a temporary chain link construction fence filed in conjunction with M00516712 at NYCHA Building #5 as per plans filed herewith.
Installation of new temporary steam piping and condensate piping for temporary boilers as per plans filed herewith.
Provide services to support Mechanical equipment removals and new installations
Provide services related to installation of new underground gas lines between existing building and restorations of supported excavations