Installation of temporary construction fence in conjunction with dob now application to be filed. fence shall comply with chapter 33 of the nyc building code.
Legalize EXTENSION ON 1 ST and 2nd floor in order to comply with VIOLATION # 39100040X.
Sistering of the existing floor joists at all floors, new reinforced concrete step-footing in cellar and new reinforced concrete retaining wall at rear yard. No change in use, egress or occupancy
Conversion of an existing two story one-family building into a two story two family building as shown on the plans. proposed horizontal enlargement. interior renovation as per plan. obtain a new certi...
Conversion of the existing one story one-family building into a two-story two-family building as shown on the plans. proposed vertical and horizontal enlargement. interior renovation as per plan. obta...
Installation of temporary construction fence in conjunction with dob now application #q01339826-i1. fence shall comply with chapter 33 of the nyc building code.
Installation of temporary construction fence in conjunction with alt-co application to be filed. fence shall comply with chapter 33 of the nyc building code. no change in use, egress or occupancy unde...
Installation of temporary construction fence in conjunction with dob now application #q01333223-i1. fence shall comply with chapter 33 of the nyc building code.
Installation of temporary construction fence in conjunction with dob now application #q01341900-i1. fence shall comply with chapter 33 of the nyc building code.
Horizontal & vertical enlargements to an existing one family dwelling along with interior renovation
Installation of temporary construction fence in conjunction w/fd applications & nb applications to be filed.