Interior job to supercede the scope of work of bis job# 420973904 on the file to withdraw the old bis job.
Relocate & cap existing sprinkler heads along with sprinkler pipes at existing approved sprinkler system at 15th floor for new tenant fit out for commercial office.
Remove and replace toilet in primary bathroom- remove and replace washer, sink , toilet and convert tub to shower in secondary bathroom- no change to use, egress or occupancy
Modification of existing plumbing system in apt. #15A, as per plans filed herewith. No change in use, egress or occupancy.
Plumbing works
Plumbing removals and new work as required to accommodate new kitchen and two bathrooms, relocate two existing radiators.
Remove & cap of existing gas & plumbing fixture. installation & replacement of new boiler, h.w.h., gas & plumbing fixtures in existing 2 story building. plumbing works as per plan.…
Swthz-- plumbing modifications and installations in conjunction with spa build out.
Sprinkler work filed in conjunction with Alt-CO application
Sprinkler work filed in conjunction with Alt-Co
Sprinkler / Standpipe application filed subsequent to NB GC, job number: M007771011-I1
Temporary Standpipe application filed subsequent to NB GC, job number: M00771011-I1.
Existing four-family house with plumbing work at right side of 1st floor & 2nd floor. job filed to related to alt-2 application #q01362253-i1.2. no change in use, means of egress o…
Plumbing filing
To propose plumbing & gas work at cellar & first floor in conjunction with alt-2 job b01294980 as per plan filled herewith, no change of use, egress or certificate of occupancy.