Spring Scaffolding Llc
Permits (781)
The plywood fence at the west (street) elevation from the ground attached to the sidewalk shed to past the 3rd floor slab.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the pipe scaffold at the northeast elevation from beam system over the equipment to the 35th fl setback and...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the sf from the top of the sh and the penthouse terrace past the main roof wall, around the bulkhead, setbac...
. installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy installation of temporary custom color sidewalk shed at central park west and west 61st st el...
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy of the sidewalk shed at west 34th street,6th avenue, and west 33rd street elevations.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress or occupancy
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at madison avenue, east 50th and east 49th street elevations.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the custom color sidewalk shed is at 7th avenue, west 45th street, and west 46th street elevat...
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the sidewalk shed columns front of the building.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed east 70th street front of the building.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence is attached to the sidewalk shed columns and located in front of the building on broome s...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at mott street and brommer street elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary needle beam / overhead protection as per plan. no change in use, egress, or occupancy. the needle beam overhead protection at 8th floor in the building
Installation of temporary need beam/overhead protection.as per plan. there is no change in use, egress, or occupancy. the need beam system/overhead protection at the north elevation on the 8th floor o...
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at 6th ave, west plaza 46th st, west plaza 47th st elevations.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is in front of the building at 81st street elevation,
Installation of temporary system stairs tower as per plan. no change in use, egress, or occupancy. the system stairs tower from the first floor to the eighth floor at east 82nd street elevation
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.