Stonegate Build Inc
Permits (45)
Construction of new interior non-load bearing walls and ceilings with wall, floor and ceiling finishes on first and second floors of existing commerical space.
Mechanical work including installation of ac units, exhaust fans, kitchen hoods, and makeup air units with ductwork.
16th floor tenant build out, interior renovation of existing eating & drinking establishment as per lno # 3848. no changes to use, egress or occupancy.
Mechanical work including installation of ac units, exhaust fans, kitchen hoods, and makeup air units with ductwork.
Construction of new interior non-load bearing walls and ceilings with wall, floor and ceiling finishes on first and second floors of existing commerical space.
16th floor tenant build out, interior renovation of existing eating & drinking establishment as per lno # 3848. no changes to use, egress or occupancy.
Interior alteration of existing commercial space on 2nd and 3rd floor, including architectural work.
Interior renovation of existing eating and drinking establishment on the basement and first floor as per CO 120819061. No changes to use, egress or occupancy.
Interior renovation existing restaurant with partition work at 1st floor. no change in use, egress or occupancy.
Existing store renovation including relocation of interior non-bearing partitions, replacement of ceiling tile, floor finish, and minor cosmetic work. no change in use, egress, or occupancy.
Interior tenant fit-out of existing eating & drinking establishment on cellar & first floor. no change to use, egress or occupancy.
Interior renovation of existing commercial space unit# 800 on 8th floor. Work includes split type heatpump ac unit and installation of partition wall at unit# 800. No change in use,egress or certifica...
Intallation of new steel members as required to infill opening with new metal deck at second floor and install new steel dunnage connected to existing steel dunnage and parapet at roof level. No chang...
To install new ductworks and air devices throughout the space and connect to existing HVAC units and Mechanical work for the exhaust hood in the commercial kitchen of an eating and drinking establishm...
Interior fitout of store space on the basement floor. Installation of new non-bearing walls. No change to egress, use, or occupancy.
Renovation of existing eating and drinking establishment at first floor. Work include install new mechanical units with dunnage at roof. No change in use, egress or certificate of occupancy.
Existing retail store to new restaurant.
Installation of mechanical duct work in commercial spaces on first and second floors and new roof top mechanical units on existing steel dunnage using existing rooftop penetrations. No change in occup...
Conversion of first and second floors from retail use to eating and drinking Occupancy Croup A-2 and obtaning Certifiacte of Occupancy for same.
16th floor tenant build out, air handler and coolant system and new kitchen exhaust system for existing eating & drinking establishment as per lno # 3848. no changes to use, egress or occupancy.