Minor interior demo, remove soffit and finishes. Install new ceiling, elevator door, wood base and finishes on the 11-13th Floors as per plans (RG _ Elevator Work.) No change to us…
Removal and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy
Alterations to existing mechancial systems as per plans filed herewith
General Construction as shown on plans filed herewith. No change to use, egress or occupancy.
General construction works as shown on plans filed herewith. No Change in use, egress, or occupancy.
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occ…
Hereby filing to install (4) new Exterior doors leading to new exterior raised structural steel platform on raised posts as shown on plans filed herewith. No change to use, occupan…
Hereby filing Supplemental structural framing for the support of window washing equipment as shown on plans filed herewith. No change to use, occupancy or egress.
General Construction demolition work taking place on floors 001-003 as per plans filed herewith. No change in Use, Egress or Occupancy.
Hereby filing to install new streel framing for raised deck as shown on plans filed herewith. No change to use, occupancy or egress.
New electrical routing for future kitchen areas. new piping connections to be made on upper floors within the building, under seperate application. there is no change in use, egres…