General construction modifications taking place on the 1st, 1Mezz, 2, and 10Mezz floors as per plans filed herewith. No change in use, egress or occupancy
Hereby filing to demolish/remove existing mechanical units with associated ductwork and piping as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to remove interior partitions, ceilings and doors as shown on plans filed herewith. No change to use, occupancy or egress.
Structural work as shown on plans filed herewith.
Modification to Mechanical systems as per plans filed herewith.
Structural modifications as per plans filed herewith.
General construction including interior renovation and change of use on the 35th floor, as shown on plans filed herewith.
General construction modifications taking place on the 16th floor as per plans filed herewith. No change in use, egress or occupancy
Modifications to the existing HVAC system on the Sub-Cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans. No change to use, egress or occupancy.
Gen constr mod of alt. taking place on the 5, 6 & 7 fl as per plans filed herewith. no change in use, egress or occupancy. the scope of work includesnew finishes, pl fixtures, and…
Hereby filing Installation of Interior Non-Bearing Partitions, Addition of Occupied Exterior Terrace onto Schedule A with Increased Occupancy for the 5th floor as shown on plans fi…
Mechanical modifications as per plans
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the Sub-cellar level 4, 10th & 11th floors (Apollo Global Management) as per plans.…
Mechanical modifications taking place on the 16 floor as per plans filed herewith. No change in use, egress or occupancy
Mechanical modifications taking place on the 5th floor as per drawings filed herewith. no change in use, egress or occupancy.
General construction modifications taking place on the 5th floor as per drawings filed herewith. no change in use, egress or occupancy.
Structural modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy
Minor demolition with of interior partitions, doors, suspended ceilings and finishes on the 37 floor as per plans. No change to use, egress or occupancy.
Filing herewith general construction to include interior renovation and minor demo as per plans