Hereby filing to remove ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. change of occupancy from 110 to 202 on the 2nd floor offices.
Filing herewith interior demo. and renovations for the 23rd FL. as per plans filed herewith. No change to use, egress or occupancy.
filing herewith Mechanical work on the 23rd FL. as per plans filed herewith. No change to use, egress or occupancy.
Hereby filing to remove ductwork and piping as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing demolition of interior non-bearing partitions and related finishes. no change in use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Interior fitout renovation, including installation of interior non-bearing partitions and related finishes. no change in use, egress or occupancy.
Removal of existing non-load bearing partitions and ceilings.
Demolition of interior non-bearing partitions and related finishes. no change in use, egress or occupancy.
Herewith filing for structural modifications as per plans to upgrade existing dunnage. no change in use,egress or occupancy.
Modification of mechanical on cellar & 1st floor as per plans. No change in use, egress or occupancy.
Construction modifications taking place on the 21st floor as indicated on the drawings.
Structural modifications taking place on the 21st & 22nd floors as indicated on the drawings.
Mechanical work as shown on plans filed herewith.
General construction works as shown on plans filed herewith. No Change in use, egress, or occupancy.
Work includes per the filed plans steel beam and connection reinforcement at 35th floor multipurpose room and cafe and new steel beam/reinforce existing steel connections at 36th f…
Fire-rated partition work to create two places of assembly and reduction of the existing office occupant load.
Mechanical modifications taking place on the 20th floor as indicated on the drawings.