Mechanical work in connection with conversion of the woodshop to robotics lab and workshop. provide new ceiling mounted heating and ventilation unit and exhaust fan.
Various site upgrade/updates. Interior renovations to building
Q595_Provide (2) new electric unit heaters for sump pits.
Remove and replace gravity exhaust /re-install roof ventilators and exhaust fans. Remove and replace louvers.
Disconnect & remove existing floor mounted steam radiator with all accessories. provide new floor mounted steam convector along with supports.
Remove and replace existing gravity ventilators , provide 2 new heat split pump units , replace all refrigerant piping with insulation on the roof deck area
Demolition of existing window ac units and toilet exhaust branches and diffusers in boy's and girl's locker room. connect new exhaust with the existing main exhaust. install new he…
Replace existing Walk-in Refrigerator in the Kitchen.
Remove and dispose of existing fume hood. Prepare duct work for new fume hood connection. Replace existing duct grill as part of ceiling replacement.
Hs 804-k: removal and reinstallation of roof top hvac equipment, removal and replacement of 2 exhaust fans, split system and provide temporary ac equipment.
Remove and replace walk-in freezer
X099-new exhaust fan, ac split heat pump system , motorized dampers.
Ps 71q - installation of 4 new air handlers in the cellar and associated ductwork. no change in egress, use or occupancy.
Temporarily remove and reinstall exist operational mechanical equipment to accomodate roof work. modify boilre blow down piping to accomodate arch slab work in cellar.
Associated mechanical for cafeteria upgrade including duct modification and louvers and lighting energy compliance