Subsequent filing for plumbing installation in an existing retail space (suite C06) as per the plans filed herewith. No change to the use, egress or occupancy.
File application in conjunction with GC application: B01371842.
Replace and install new plumbing fixtures in cellar, 1st and 2nd floor of existing two family house.
Install temporary standpipe in the vacant building as requested by the FDNY. Plans reviewed and approved by FDNY. No change to use egress or occupancy.
File pl worktype in conjunction with job#b01359900
Interior renovation existing commercial space with plumbing work on 2nd floor. no change in use, egress or occupancy.
Plumbing work for existing one family dwelling. install new bathroom fixtures @ cellar, 1st and 2nd floor as per plans. no change in use,egress and occupancy.
Plumbing work filed in conjunction with alt-co for new sanitary piping to existing combined sewer, new gas, new domestic water system.
Subsequent filing of plumbing work for three-family dwelling units.
First floor three-piece bathroom existing fixtures to be replaced with new. converting the bathroom closet into a new washer/dryer area.
Plumbing application in conjunction with GC application #B01364300.
Install new women's toilet, rearrange men's toilet, add sinks in prep room