Installatiion of new wall mounted ac unit and exhaust fan ductwork modifications in elevator machine room
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings fo…
Filing herewith mechanical/hvac installations, additions, and modifications to existing building system as per plans.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 27 through 29. Construction costs and filing fees included in full-floor Mechanical job # M01293931-S1.…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 07 through 08. Construction costs and filing fees included in full-floor Mechanical job #M01293902-S1.…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 34 through 38. Construction costs and filing fees included in full-floor Mechanical job # M01293987-S1.…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 03 through 06. Construction costs and filing fees included in full-floor Mechanical job #M01293886-S1.…
Repairs to lower carbon emissions, demolish steam boiler and associated radiators and RIP mechanical equipment, install electric heaters in lieu of steam radiators and equipment fo…
Provide protection for the replacement of existing boilers and air conditioning equipment to comply with Local Law 97. Minor interior work replacing doors and relocate managers off…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 24 through 26. Construction costs and filing fees included in full-floor Mechanical job # M01293926-S1.…
Early-phase Mechanical modifications to fan powered boxes and fans on Floor 19. Construction costs and filing fees included in full-floor Mechanical job #M01293917-S1. No change in…