Filing herewith support of excavation (SOE) for the proposed elevator pit and ejector pit as per plans. Filed in conjunction with structural (which includes partial demolition) app…
Job filed herewith (in conjunction with job#M01194094) to include an ACP5 Report capturing that the proposed Mechanical work will not disturb any asbestos-containing material. Cons…
Job filed herewith (in conjunction with job#M01194094) to cover interior soft demolition for the referenced floors. This work is to be filed with an ACP5 capturing the work which d…
Filing for selective Demolition/Construction and protection related to a Mechanical Equipment upgrade and Structural steel to support ducts to concrete slab.
Filing for selective Demolition/Construction and protection of Partial Cellar through 10th floor related to a Mechanical Equipment upgrade.
interior demolition on 13th and 14th floor as per plans filed herewith. No change in use, egress or occupancy,
Installatiion of new wall mounted ac unit and exhaust fan ductwork modifications in elevator machine room
filing herewith elevator modifications as per plans filed herewith.
Structural modifications including but not limited to slab removals for pits and doors, demolition of catwalk beams and bracing beams, shear wall openings, framing, new openings fo…
Filing herewith mechanical/hvac installations, additions, and modifications to existing building system as per plans.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 27 through 29. Construction costs and filing fees included in full-floor Mechanical job # M01293931-S1.…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 34 through 38. Construction costs and filing fees included in full-floor Mechanical job # M01293987-S1.…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 07 through 08. Construction costs and filing fees included in full-floor Mechanical job #M01293902-S1.…