full demolition of one-story structure, using mechanical means.
mechanical equipment to assist with demolition
mechanical equipment will be used to assist with full demolition
full demolition of one story structure, using mechanical means from grade.
Partial Demo means & methods (plaza level only) for removal of Guggenheim Bandshell as per plans.
Partial Demo means & methods for interior demo and slab cut (plaza level only) as per plans.
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Mechanical Demo Equipment for use during partial interior demo and slab cut (plaza level only) as per plans.
Mechanical demolition equipment for use during partial demolition (plaza level only) to remove Guggenheim Bandshell.
Use of mechanical demolition equipment for slab opening, filed separately under m01357468-i1.
Mechanical equipment, excavator, inconjucntion with partial demo work due to fire damage area. dob emergency work order (ewo) number: 012826feu30601kr.
Partial demolition of fire damage area, all work to be performed under dob emergency work order (ewo) number: 012826feu30601kr. demolition will be performed under the direction and…
full demolition of 26 story structure using hand held and mechanical means to assist.
installation of construction fence under DOB EWO to protect site
full demolition of 14 story structure using hand held and mechanical means to assist
mechanical means to assist with DOB EWO for fire damaged structure
Use of mechanical demolition equipment during partial demolition, filed separately under M01299104-S3.
Debris chute and mechanical equipment use in conjunction with partial interior non-structural demolition: skid steer loader, track loader, mini loader, demo robots, and mini excava…