Titan Industrial Svc Corp
Permits (55)
Glass removal at 14-story commercial building
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or...
Removal of rooftop equipment for 14-story commercial building
These plans are filed to remove the decommisonned ductwork existing at the roof 24 w 67th street.
Removal of rooftop equipment for 14-story commercial building
Glass removal at 14-story commercial building
These plans are filed to remove the decommisonned ductwork existing at the roof 24 w 67th street.
Interior demolition in preparation for full demolition of 14-story commercial building
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Phase 2: Partial Demolition Means & Methods for park and garage/parking structure as per plans.
Debris chute for the interior demolition of 14-story commercial building
Equipment use for interior demolition of 14-story commercial building
Debris chute for the interior demolition of 14-story commercial building
Equipment use for interior demolition of 14-story commercial building
Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01314553.
Use of mechanical demolition equipment during Phase 1 Damrosch Park alteration, filed separately under M01314553.
full demolition of 26 story structure using hand held and mechanical means to assist.
full demolition of 26 story structure using hand held and mechanical means to assist.
Install 8' high plywood construction fence
Install 8' high plywood construction fence