Office renovation (tagwall) work to include partitions, ceiling and door modifications as indicated on plans. no change in use, egress or occupancy.
Structural modifications including concrete on metal deck infill at existing stair opening. No change in use, egress or occupancy.
Removal of ductwork and associated equipment on the 1st floor as indicated on drawings.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping as shown on plans filed herewith for office fit out. No change to use, occupancy or egress.
Mechanical filing as per plans. No change in use, egress or occupancy.
Interior demolition of non load bearing partitions on the 1st floor and modification of existing storefront as indicated on drawings.
At 2nd and 3rd floor tenant space, structural modifications in conjunction with new stair opening and additional support for movable partitions as per plans filed herewith. no chan…
Hereby filing to construct interior partitions, ceilings, and doors for new office suites as shown on plans filed herewith. No change to use, occupancy or egress.
Interior renovation of partitions, ceilings and doors for existing office space including infill of existing stair opening to separate the 46th and 47th floors. No change in use, e…
At 2nd floor tenant space, removal of existing ductwork and additions/modifications to existing mechanical system including new units and related piping and ductwork as per plans f…