Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicati…
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
The plans enclosed depict the extent, sequence, meand and methods for the proposed facade repairs on the 6 story building located at 314 w 14th st, borough of manhattan, ny 10014
Installation of suspended scaffold for facade inspection/repair.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use or occupancy.
application filed for facade & roof repairs as per drawings filed herewith. no change to use, egress or occupancy as a part of this application
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior renovation. no change to use, egress or occupancy.
Installation of temporary adjacent roof protections per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this a…
Installation of suspended scaffold for facade inspection /repairs