Welldone Inspections Inc
Permits (42)
Interior renovation of a store to be a nail salon. no change in use, occupancy, or egress.
Modification of Cellar, 1st, Mezzanine, 3rd, 4th, 7th, 8th, 11th, 12th, 13th Mezzanine, 14th, 15th, roof per plans filed
Modification of Cellar, 1st, Mezzanine, 3rd, 4th, 7th, 8th, 11th, 12th, 13th Mezzanine, 14th, 15th, roof per plans filed
Interior renovation of existing 2 family dwelling on basement, 1st and 2nd floor as per plan. no change in egress, use or occupancy.
Interior renovation of existing 2 family dwelling on basement, 1st and 2nd floor as per plan. no change in egress, use or occupancy.
Modification of Basement and Roof per plans filed herewith; including the creation of a new Fire Pump & Diesel Tank Pump Rms. at basement, new door at penthouse to access new generator and water tank...
Modification of Roof per plans filed herewith
Modification of Roof per plans filed herewith
Modification of Basement and Roof per plans filed herewith; including the creation of a new Fire Pump & Diesel Tank Pump Rms. at basement, new door at penthouse to access new generator and water tank...
Interior renovation store on 1st floor of existing 6 story building. construction work as per plan. no change in egress, use or occupancy.
Interior renovation store on 1st floor of existing 6 story building. construction work as per plan. no change in egress, use or occupancy.
Alteration. replace wall finish for all stairwells. no change in use, occupancy or egress.
Alteration. replace wall finish for all stairwells. no change in use, occupancy or egress.
Restoring the cellar floor to original conditions and filing to cure the violation #39107597p as per plans submitted. no change in use, egress or occupancy.
Restoring the cellar floor to original conditions and filing to cure the violation #39107597p as per plans submitted. no change in use, egress or occupancy.
Scope of work to include installation of footing, grade beam, steel framing, wood slab and steel joists for a 4-story mixed use building.
Scope of work to include installation of footing, grade beam, steel framing, wood slab and steel joists for a 4-story mixed use building.
Scope of work will include the interior demolition at the first floor to address ecb violation #34650205j. no change in use, occupancy or egress.
Scope of work will include the interior demolition at the first floor to address ecb violation #34650205j. no change in use, occupancy or egress.
Interior renovation of exisitng 1st floor with two story house. no change in use, occupancy or egress.