9th cycle fisp repairs consisting of brickreplacement, stone repairs, steel lintel repairs & replacement, misc sealant replacement, railing installation & roof replacement. no chan…
Installation of swing stage suspended scaffold as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy
Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of heavy duty sidewalk shed with material storage (300 psf and 600 psf) during facade repair. no change in egress, use, or occupancy. shed to comply with 2014 nyc buil…
Installation of Sidewalk Shed and Pipe Scaffolding as per plan and in accordance with Chapter 33 of NYC 2022 Building Code. No change in use, egress ro occupancy
General facade repair filing includes exterior sealant replacement, terrace door sills seal, limestone repair & replacement, limestone dutchman installation, rout limestone cracks,…
Installation of 335' lf heavy duty sidewalk shed as per plans rated for 300 psf & 600 psf debris and material storage. no change to egress, use, or occupancy.
Installation of roof protection at neighboring roof (842 5th Ave) during work at 4 E 66 street, as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use…
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this ap…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicati…
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…