Install of temp Truss Arch, production equip, no alt to exist structure for Annual 5 Boro Bike Tour Start Arch. TPA not req. Producer is responsible to monitor site safety & implem…
Install of temp tents, platforms and ancillary structures, no alt to exist structures for Annual NYC Runs BK Half Finish. TPA as reqd. Producer is responsible to monitor site safet…
Install of temp tents, platforms, truss no alt to exist structures for Brooklyn Public Library Gala. A TPA is required. Producer is responsible to monitor site safety & implement H…
Installation of temporary indoor structures consisting of a scenic arbor, a decorative trellis, and a performance platform.
Installation of existing deployable stage roof, temporary performance platform, bleachers, decking, tenting. No alteration to existing structures for Summer Stage Concerts. A TPA p…
Temporary structures for an event Pier 59 Studios. Removed at the end of the programing. No changes to existing structures, use or egress.
Installation of temp Frame Arches.no alt to exist structures for VCA Blooms 2025. A TPA permit is required. Producer is responsible to monitor site safety & implement HWAP. All pro…
Temporary structures for IAC event programming in the multipurpose room. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary scenic structures for a red carpet event. Removed at the end of the programing. No changes to existing structures, use or egress.
Installation of temporary inflatable, no alt to exist structures for Inflatable Butts at Flatiron Plaza. TPA permit not req. Producer responsible to monitor site safety & implement…
Temporary structure for an WNBA event at HY Plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary platform for a film shoot. Removed at the end of the programing. No changes to existing structures, use or egress.
Temporary structures for The Shed cultural and event programing. Removed at the end of the programing. No changes to existing structures, use or egress
Install of temp scenic partitions and elements, no alt to exist structures, for Tiffany Exhibit. TPA not required, TUP filed as needed. Producer is responsible to monitor site safe…