Zaq Construction Inc
Permits (71)
Filed this application to resolve the summons # 039109660h & ecb violation #39109643x for one family dwelling unit. horizontal & vertical enlargement involved. obtain new c of o.
File application to solve ecb violation 35685819K. Replace existing awning and minor repair balcony at 3rd fl. There is no change in use, egress and occupancy.
Interior renovation for restaurant @ 1st. floor. install commerical kitchen hood. no change in use, egress and occupancy.
File application to resolve ECB violations Nos. 39166036P, 35668992J, 35668991H, and 35668990X. Scope includes minor partition work to restore premises to legal conditions. No change to use, egress, o...
Interior non-structural renovation of apartment #9g. replacement of cabinets fixtures, finishes, and lighting. no change in use, occupancy or egress.
Interior renovation in existing eating & drinking establishment only. no changes in use, egress and occupancy.
Interior renovation in existing eating & drinking establishment only. no changes in use, egress and occupancy.
Install temporary construction fence @ osp.
Interior renovation for existing 1 family dwelling unit. There is no change in use, egress and occupancy.
Install temporary construction fence @ osp.
Interior renovation for existing 1 family dwelling unit. There is no change in use, egress and occupancy.
Filed for interior work cellar to 4th floor work includes installing wall, fl. & wall tiles, paints, frames, door, girder with steel posts, footing & repairing exist. stair. remove concrete in the cel...
interior renovation to the partial first floor and change of use from factory to recreational use
Filed for interior work cellar to 4th floor work includes installing wall, fl. & wall tiles, paints, frames, door, girder with steel posts, footing & repairing exist. stair. remove concrete in the cel...
interior renovation to the partial first floor and change of use from factory to recreational use
Interior renovation for existing 1 family dwelling house. There is no change in use. egress and occupancy.
Non-structural repair work to all exterior wall areas and localized roof sheathing that were removed during DEP-permitted asbestos abatement; no change to occupancy, use, egress, or structure.
Interior renovation at cellar only as per plan. no change in use, egress and occupancy.
Non-structural repair work to all exterior wall areas and localized roof sheathing that were removed during DEP-permitted asbestos abatement; no change to occupancy, use, egress, or structure.
Interior renovation for existing 1 family dwelling house. There is no change in use. egress and occupancy.