Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2014 nyc building code. no change in use, egress or occupancy under th…
Remove and replace existing roofing membrane and insulation down to concreteroof slab.repair/patch existing slab and provide new roofing membrane and rigid insulation,as notedon dr…
Herewith filing the conversion of a multiple dwelling into a single-family home. General construction work, as per plan submitted. New Certificate of Occupancy to be obtained.
Claremont Bldg 4, Exterior Retaining Wall Reconstruction: Excavation/Placement/Compaction of existing landscaping, paving, backfill/soil fill and overburden/fill behind existing re…
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this app…
Facade repair work as per plans. no change in use, egress, or occupancy.
Remove all stairs, existing partitions, electrical and plumbing. new stairs, subfloor, floor. new partitions and finishes
Facade restoration at Forest House Building # 09 to comply with LL 11/98, cycle 10 report. No change in use, egress and / or occupancy.
Facade restoration at Forest House Building # 11 to comply with LL 11/98, cycle 10 report. No change in use, egress and / or occupancy.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under th…