Permits with an identified homeowner but no contractor assigned.
11,111 opportunities in the last 30 days
Special Events
add new habitable space on ground flr w/ 1-bedroom, 1-bathroom, closet, media room, laundry & powder room. replace & relocate (e) furnace & water heater on ground flr. reconfigure 2/f, replace 14 wind...
replace fire place w/ insert gas fire place in living room per manufacturer's specifications. replace two french doors and one fixed window at rear in kind in the existing openings.
4,5,9,14,15,16 f/l - interior non-structural demo of (e) unoccupied floors include removal of walls, ceilings, millwork, finishes, doors, light fixtures per ab-017.
convert laundry room to new master bathroom, walking shower , double sink vanity, toilet, 2 recessed lights, mirror
recommencement and completion of work under pa#: 202104299542
recommencement and completion of work under pa#: 201811135654, 202307182428.
Electrical
relocate top unit to 1st floor, and merge 2nd, and 3rd floors as one unit (side two-story). side two-story addition to expand floor area at first and 2nd floors, roof deck deck; full remodel all three...
unit 203: remodel kitchen and bathroom, no structual work, all fixtures to remain the same, tub to shower conversion.
9th flr: suite 925: mech + electrical for 202512051085
remodel existing kitchen and bathroom, new cabinets and counter tops for kitchen.
Plumbing
Gas
Low Voltage
per nov 2024-24761, remove illegal stairs from 2nd level deck to grade. install (n) guard rail at deck to match (e) guardrail on either side. also install landscaping at front per pa 2016.0606.9471. n...
unit 2: 1 60 sf kitchen and 1 40 sf bathroom rmeodel. no change in layout. electrical and pumbing updates in unit. no wall demolishing.
ref pa# 202601214264: hvac modifications to support interior tenant. all terminal units are existing. (e) central equipment, (e) controls.