Manhattan, NY
Manhattan · NY
Manhattan · NY
Modifying heads to accommodate the new separation wall between buildings. Creating a new bypass loop at the location of the building separation on the 2nd Floor. Connecting the existing sprinkler layout in the south portion of 663 Fifth to the
6 other permits at Manhattan, NY. Electrical, plumbing and HVAC on one property often share a GC, so follow the paper trail.
Modifying ductwork & supply diffuser to accommodate new partition layout, Demolition of existing AC systems & ductwork .Adding air conditioning units to the 2nd floor to supplement…
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building n…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…