259 issued permits in Castro/Upper Market, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
259 permits
interior remodel of kitchen and two bathrooms; no changes to the interior walls. all windows being replaced. electrical & plumbing modifications. no mechanical changes proposed.
erect 4-story over basement, type vb, 2-unit residential building.
demolish 3-story type vb single family dwelling.
reconstruction of rear deck and stairs. replace rear windows with fire rated units in same openings. no additional exterior work.
to obtain final inspection for work approved under pa 202101052117,202011209381,202002144559. all work is complete.
unit 9: bathroom remodel, non structural remodel, remove and replace (e) floor and shower tiles. install new shower water proofing system. replace vanity, toilet, & faucet in same…
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
exterior stair repair less than 50%, replace with new wood in-kind, not visible from street.
reroofing: hot works
unit g: like for like bathroom remodel, m.e.p. staying in the same location, (e) tub to be replace by another tub
revision to 202305268680: update window locations at the shared access alleyway, a new garage man door at western front facade, update heating system from hydronic to ductless mini…
addition of french drain & foundation waterproofing permit in response to complaint #2026-53675
addition of french drain & foundation waterproofing permit in responce to complaint #2026-53675
remove and replace water proofing for balcony. balcony is in back non street facing.
unit 9: 1 kitchen and 1 bathroom remodel like for like.
prop h:revision to pa# 202512081211. tenant fit out of an existing business space. new interior partitions, finishes and fixtures. new electrical, lighting mechanical systems and c…
new plan configuration for the master bedroom bathroom, remove non-load bearing walls. bathroom remodel is uner permit 202601204129
change 2 (e) windows, repair water damaged finishes/plumbing fixtures in bathroom @ basement strage. no electrical or mechanical scope.
provide asbestos abatement per survey dated 2-24-2026. scope includes removal of 150 lf of asbestos, tested non detect for asbstos. work to include full containments, negative pres…
front building units 584-586-removal and replacement of (e) brick foundation with concrete foundation