259 issued permits in Castro/Upper Market, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
259 permits
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
solar permit: installing 13 solar pv modules, 410 watts per module, total no. of rating 5.33 kw. mounted: roof, ballasted: n, including 1 energy storage unit, with 15 kwh each in c…
to obtain final inspection for work approved under pa#: 202208291471. all work is complete.
front bldg: remove existing cernamic tiles in master bathroom on 1st floor and replace in kind. approx 50 sq ft.
reroof 1800 sq ft tear off and to install polyglass. hot work permit#126727
reroofing no hot works
at&t mod of an unmanned wireless facity consisting of: r/r 3 antennas, remove 6 rrus, install 3 rrus, relocate 6 rrus, install netsure conversion kit w/ 8 converters and (3) 50 amp…
bathroom remodel: upgrade the plumbing and install enw plumbing fixtures in shower, new vanity, new extractor fan(replace) upgrade electrical 3 new can lights and wall scone 1 gfc1…
rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide…
apt #7:revise scope of work of p/a 2026-0109-3568 to include the removal and replacement of about 6 2x10x10' ceiling joists in the 2nd bedroom; replace main room, 1st bedroom and 2…
replace (e) covered deck with new 275 sf open deck attached to on fully detached two unit residence.
to obtain final inspection for work approved under 200210078362 and 200208023023. all work is complete
to keep existing ground floor storage space to be used for storage purposes only. not to be considered habitable space. also remove the wet bar/sink that has previously installed w…
address nov 202649698 &202649709. replace all non functional heaters. repair 40% of the deck, replace water heater flu pipe. repair exposed wiring for garage light fixture. replace…
replace rotted stair treads and risers, exterior landing boards, rotted 4x4 support under first landing, and handrail sections (8 fett only) at the exterior back yard staricase to…
improve front facade appearance by adding decorative trims and ornaments.
the project is an kind replacement of a 2 story wood framed exit stair and covered porches. includes: new exterior finishes, windows, and exterior doors at the south facade. new sh…
(n) plumbing, drainage, electrical, ventilation; bathr remodel in-kind; change of use (retail to coffee shop); add in required had, 3 compartment & mop sinks, new front door, new f…
apt 302: full bathroom remodel. convert tub to shower. replace toilet, sink, vanity, fan. upgrade mep to code. add washer and dryer behind shower wall in hallway closet.