751 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
751 permits
revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house.
revision to bp# 202310058107; seismic bracing for 4000a, 1600a & 800a, electrical bus duct
install (2) identical raceway with illuminated 17 channel letters signs: "haraz coffee house" facing street.
50th fl - electrical & office retrofit lighting fixtures & associated circuiting/controls, power & signal devices & associated wiring; mechanical: demo & revise existing ductwork &…
4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restrooms
revision 202503283322 painted concrete finish at column level 1: column-remove plaster and have a painted finish at only the south face of the column.3 sides, unpainted. level 2: c…
7/f: structural reinforcement at two beam locations for gym equipment. building is fully sprinklered.
replace flooring material, add cabinetry in laundry room, add decorative feature in linging room, replace hinged door with pocket doors.
install 3 evacuation maps on 28th floor.
front window box: repair/replace tile veneer at under storefront windows. normal maintenance to replaced cracked tiles/veneers in-kind as needed. 40lf.
suite 350: mechanical work for t.i. ref pa#202511069032
11/f: deferred electrical permit for ti bpa 202512171972. new power and signal devices througthout space. new 2022 t24 compliant lighting and control.
b14 retail: removal of (e) interior mezzanine, including ceiling, walls, floor, interior windows, lighting fixtures, finishes, stairs accessing the mezzanine, and single-user restr…
ground floor - suite b14: tenant interior improvement for new bank office space including office spaces, storage rooms, staff break area and new single-user restroom. all fire prot…
lobby: upgrade e) finishes of lobby in "w" hotel. upgrade lighting and n) chandeliers. add interior door/panels in dining area. add tv in lounge. add 2 fire extinguishers cabinets.…
23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or fl…
unit 8a: remodel 3 bathrooms. tub to shower in master bath. 1 kitchen like for like.
8/f: revise fire sprinkler system to accommodate new tenant floor layout. relocating 80 heads and installing 105 new heads. total of 185 sprinkler heads
30/f: mechanical and electrical permit to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref pa# 202601274610.
at&t: modification of an existing telecommunications facility consisting: r/r 3 antennas within e frp radomes; r/r 3 rru's; remove (20) 155 ah & (12) 180 ah batteries; install (20)…