751 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
751 permits
as built of bpa: 202511260480 - adjusting automatic fire sprinklers system to provide coverage per area of construction modification , all hangers and sway bracing are existing, ha…
4,5,9,14,15,16 f/l - interior non-structural demo of (e) unoccupied floors include removal of walls, ceilings, millwork, finishes, doors, light fixtures per ab-017.
9th flr: suite 925: mech + electrical for 202512051085
ref pa# 202601214264: hvac modifications to support interior tenant. all terminal units are existing. (e) central equipment, (e) controls.
3/f: partial office tenant improvement. arch - addition of new non-structural, non-rated drywall partitions per plan for existing office reception area with new floor finish and ne…
revison to pa# 202506279718. revision to non structural partitions, mep, structural elements. level 1.
10/f: tenant improvement. demolition - removal of non-structural partitions and finishes. removal of (e) retail stair finishes. arch - addition of new stair, non-rated drywalls and…
unit 1402: revision to bpa: 202508183262 - demo and re-frame 3 non- load bearing walls to fit new cabinetry, new closet interiors for 4 closets. (plumbing safe off for laundry room…
unit 1401: - revision to bpa: 202508183260. remove 2 (e) walls in bedroom, 3 closets, build 2 new walls for longer closet, reframe walls in living room for mechanical art lift. new…
verizon wireless tua: temp wireless facility to install 9 antennas; (1) mw dish; 3 rrus' 200a elec service; conduits; batteries
4-5/fl- ti includes the installation of (n) comunicationg stair
5th fl - interior ti which includes demo and construction of office, conference rooms, a loung and retrooms. structural work included. mep deferred
15th floor: mech - demo mech systems, removal perimeter induction units vav boxes. relocate (2) vav boxes new fire smoke damper. electrical - fire smoke damage electrical.
to comply with disables access - per ab-056. in order to demonstrate compliance with diabled access requirments for commericial office building access at 181 fremont st.
as-built ti: add (6) smoke detectors and (4) duct detectors. arch ref# 202510036672
ref bpa:202512313114 - adjust low side air distribution, new cooling, vav box, new transfer air, light fixtures, circuits/controls, power and signal devices new plumbing
6/fl-revision 202512121724 to change (e) finishes and remove (e) card readers, revise concrete column mounted tv to be ceiling mounted. update dedicated cooling unit. revise door m…
deferred mep for office ti permit 202603036821. spec suites 250 and 270.
electrical lighting for 202507211257
12/f suite 1275-1285: as-built for fire sprinkler bpa 202602125832. update drawings for adjusted piping plan. ref t.i 202512171960