751 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
751 permits
27/f- as-builts: install (1) 2 way comm call station with signage. arch ref# 201805189519.
30/f: as-built to permit# 202512081230. install (2) ceiling mount speaker strobes. install (1) control relay.
revision to bpa: 202506279718 - demo (e) sub floor including wood sleepers framing, plywood concrete over build. replace new lvl framing and plywood sheating per plan.
16th floor - mep submittal to support approved architectural permit. new vav boxes, ductwork, lighting and power. ref # 202512222377
ste 2118 21st floor: interior work tenant improvement to an (e) dental office space. scope of work includes new partitions, millwork, interior finishes, lighting, dental equipment…
unit 1404: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer.
revision 202602176002-unit 1406: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer.
revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open dur…
7/f-ste 710. ti include the demo fo non structural partition and bldg non-structural partitions. all new or revised meps and life safety work will be design build and submitted for…
to obtain final inspection under pa# 9912819. all work is complete.
20/f: revision to permit 202511109312. technical infeasibility request for men's restroom screen.
fabricate and install (1) non-illuminated wall mounted sign.
fabricate and install (1) internally face illuminated canopy sign. connecting to power source w/ dedicated 20amp circuit, and astronomical timer
install (40) evacuation maps on all levels
basement level scope of work in cludes repairs to (e) built up riverted columns repair limited to base of column exposed to moisture repair.
32nd/f: deferred electrical for t.i. 202601284665. lighting, lighting controls, power & wiring devices t.i., new single use gender neutural restroom
1st/f ste# 150: revision to 202512030848, install 2 phone pods
26/f: deferred mep for pa# 202512172035.
45/fl- temp wall only
(ste 350) deferred mep to pa# 202510026586: tenant improvement project/alternation of (e) office space. mech modifications to accomodate architectural layout changes. ductwork, wit…