754 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
754 permits
reroof w/hot works, proposed cool-roof material (crrc# 0742-0018) exceeds minimum solar reflectance and solar reflectance index values.
8/fl: mech:replace low pressure ductwork for whole floor, install 6 new terminal units. elec:new power & signal devices throughout. new title 24 compliant lighting & controls. plum…
44th fl - partial floor ti. demo existing partition, new partitions, heating, cooling, power & lighting
16th floor ab-017 applies: consists of interior demolition of non-structural elements including but not necessarily limited to interior partitions, doors, finishes, ceilings, light…
24th floor: consists of interior demolition of non-structural elements including but not necessarily limitted to interior partitions, doors, finishes, ceilings, lighting, mechanica…
6th fl, suite 600 ti to add card reader to existing suite/entry. all new or revised electrical and life safety work will be design - build and submitted for permit separately
basement lv: revision to pa# 202507231437, arch pa# 2024-0325-8522 - delete added fsd.
suite: 116 & 117: interior tenant improvement for personal fitness- appt only,pilates equipment is moveable and not permantly anchored. no structural work, no exterior work. mep &…
suite 100: office tenanat retrofit-lighting fixtures and associated circuting/controls, power and signal devices and associated wiring. ref pa#202511200064
revision to pa #202503283322. cmu wall demo/reconstruct and level 2 walls.
to obtain final inspection for work approved under 2007-1207-9939, all work is complete.
3rd fl - tenant improvement to include millwork, doors, frames, sidelights, ceiling tiles. mep under separate pertmi
defferred green living wall submission associated with approved pa #202410173107
28th floor: demo only permit to remove non-structural partitions for future tenant improvement per ab-017.
re-roofing. no hot works. no work to (e) roof structural sheathing.
prep and repaint portions of exterior facade to match existing. non-structural maintenance. no change to openings, materials, or structural elements.
install (1) non-illuminated wall sign: "fidelity investments"
8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant…
4th floor: new common corridor, new idividual tenant suites & restroom renovation. demolition of (e) non structural partitions construction of non structural partitions, doors, lig…
revision to permit #202509034442, tenant improvement, entry door reconfiguration, conference room addition, finishes, electrical/plumbing is design build