754 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
754 permits
the fabrication and installation of 8 acrylic evacuation maps for 13th and 14th floors.
install temp generator base tank alongside building adjacent to tapp access box. r/r 200 gallon day tank.
10/f: deferred electrical upgrade to permit 202602276645
hoa/common area: replace exterior security access gate at e) stair to podium lvl, this work won't effect public walkway
move handicapped table, revision to 202507030100
revision to pa #202503071771: revise scope of mechanical work. remove hvac ducting in surrounding unoccupied spaces in preperation of future projects. revise plan of busway crossin…
ste 501. (2) new privacy pods. provide seismic anchorage to concrete slab.
demo of single wall ust and temporary remote fill to serve existing day tanks only. a future period will be obtained to install a replacement double wall ust
20/f: ti demo (e) + (n) partitions, break area, meeting rooms, mep finishes.
40/f - unit 4005: remodel kitchen and master bath in kind, no layout change. adding steam unit, change tub to shower in master bathroom. hallway bathroom remodel in kind, no layout…
8th floor: .ti including - build out of new open work space, enclosed offices, meeting rooms, restrooms and pantry.
suite 1200, 1275, 1285, 1300. 12th and 13th flr. as built: 202602125819 11 new speaker strobes on 12th floor 6 new speaker strobes on 13th floor
suite 2350: deferred mep for pa # 2026-0121-4223. new ducts & air distribution. new lighting, power & plumbing.
12th fl - interior ti to demo and construct non-structural partitions, doors, finishes, ceilings, lighting and millwork. mep deferred
patio demo. remove exisitng planting beds & security fencing
ste 870-876-ti. include demo of non structural partitions and ceiling. scope includes construction of new partitions, ceiling, power & finishes. seperate permits for fire/lifesafty…
suite #810-t.i. include demo of non structural partition walls, ceiling, construction of new partitions, ceiling, pwer & finishes, market ready condition of ste will be used for ma…
unit 36c: primary bathroom shower remodel, replace vanity countertop, replace gfci receptacle.
7/f: two way ecs installation per fire comment on fire-26-119. install (1) cornell call station with signage. arch ref 202511200104.
22nd floor: minor interior t.i. new partitions and finishes