754 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
754 permits
unit #1504: one bathroom one kitchen remodel in kind like for like.
unit #605: one bathroom one kitchen remodel in kind like for like.
3rd/f: interior t.i. selective demo & construction of interior partitions, new offices, conference rooms, lounge, & restrooms, structural work included, med deferred
ground floor- ti of exterior and interior of (e) building for a fast casual restaurant . (n) partition and includes upgrade to mep
install (1) single sided wall sign illunimated facing street for "south park animal hospital" called sign c
ground floor tenant improvement for a coffee shop (649sf) at an existing drinking shop. new electrical and plumbing. no exterior works.
5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will…
non-structural interior demolition on floors 4,5, and 6 per ab-017
29th & 30th fl: revision to pa #2025-1215-1798. stair demo and infill at 30th fl only
to comply with accessible business entrance program abe #202207012255. addition of a ramp in the sidewalk area. minor sidewalk encroachment granted. see 24 mse-00195
new tenant stairs on the 12th & 13th floors. work includes structural supports and new finishes and mother's/wellness rooms millwork alterations.
14th fl - partial non-structural demolition and new tenant fit out of the 14th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep
10/f: demolition of existing non-structural partitions, decorative ceiling baffles, lighting, millwork and finishes. new constructuion of new finishes, millwork and decorative ligh…
13/f: tenant fit out of 13th floor. non structural demolition. new partitions, ceilings, doors, equipment and finishes. mep.
11th flr - partial non-structural demolition and new tenant fit out of the 11th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep
12th fl: non-structural demolition and new tenant fit out of the 12th floor. work includes new partitions, ceiling doors, equipment and finishes. new mep. create new opening in e)…
5th floor: mechanical, electrical, and plumbing work for t.i. ref pa #202601294807
t.i. on 5th flr to include construction of full height partitions, doors, glazing millwork and finishes. mechanical and electrical under sep permit.
as built revision to pa 2025-0618-9005 ref pa 2025-0926-6156 f/a as built to 202512313113