754 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
754 permits
installing and anchoring furniture phone booths on office floor 7.
ste 1200- ti to include demo of non structural partitions and ceiling. construction of (n) partitions, ceiling, power and finishes. market ready coalition of will be used for marke…
spec suites 250 & 270 -2/f: interior demolition and new construction of non-structural interior partitions, doors, finishes, ceilings, lighting, mechanical and elctrical outlets an…
5th/f - revison to approved permit# 2025-1126-0530. demo of moveable wall. construct new wall, new door and upgrade to mechanical electrical equipement due to new room.
provide new transfer air grille, new duct & diffusers to serve new floor plan layout. rebalance existing terminal unit, diffusers as required for pressurization ventilation and exh…
to obtain final inspection for work approved under pa # 202412116597. all work is complete.
revision to pa #202410082497. clarification of ceiling beam of roof framing plan. existing work with no stuctural update.
retrofit door (interior). install new door. (interior). small partition wall (interior)
unit 1805: one kitchen and bathroom remodel like for like.
unit#316: revision to pa#202601083442, to adjust unit layout to reflect current existing site conditions and dimensions
ground & 2nd fl - ti include new ceiling, lighting & finishes, mep,l/s & sprinklers work to be design build & filed under separate permit (bldg is fully sprinklered).
unit 812: one kitchen and bathroom remodel in kind.
19th floor. add 2 ton wshp to serve 1df room.
23rd floor. fire alarm. 3 relay modules, 1 control module, 3 duct detectors, 10 smoke detectors, 16 speaker strobes to be added. pa ref#: 202510207671.
replace damaged fascia panel at (e) awning
revision to bpa#202510248065, administrative permit to remove deferred sprinkler permit requirement ref sffd ab 2.04
rooftop 9th/f: replace 5 rooftop air handlers with new air handlers with similar capacities for heating, cooling & electrical, ahus are of similar weights
replacement of 5 exhaust hans on 9th/f
remove failing eqipment and perform emergency repair wokr by replacing with (n) fillport equipment.
ste 450.scope of work on the 4/f consists of selective demo and new construction of non structural partition, doors, finishes, ceiling, lighting, mep and millwork, scope also inclu…