751 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
751 permits
to obtain final inspection for work approved under pa# 202111092063. all work is complete.
20th & 21st/ relocation of partitions on 20 th and 2st level. new kitchen and bathroom and media rooms. nnew flooring thruout.
major alteration of (e) 4 story bldg. including replacement of all (e) structural elements u.o.n., (as shown in plans), with (n) 7 story type 1b structure, includes vertical additi…
b1 & b2 levels: upgrade fire sprinklers sytem for new ev charging stations. reolcate 36 and add 5 uprights sprinklers. t.i. 202506269604.
ti at 7th floor: convert existing space into an "apiro modular wall system" with intergrated lighting as new flexible office work space. limited to 7th floor
ti at 7th floor: ti of an office area. installing modular wall panel system 8.0" tall with intergrated low voltage
installation of 2 type-1 ventless hoods (hood mart) for electric cooking equipment (electric fryer and induction range); installation of a two-deck electric pizza oven (type-2 hood…
updated evacuation plans on floors 5,6,7.
basement level: interior ti removal of non structrual partitions, finishes and millwork. new non structrual partitions, finishes, break room millwork and upgrade to restrooms for a…
25th floor consists of interior t.i. to expand suite 2575 into 2550, & to demise suite 2550. work includes demolition of non structural elements, inclidng but not limited to interi…
2nd floor: interior ti - removal of non-structural partitions and finishes. new partitions, finishes, and accessibility upgrades to restrooms.
16/fl-scope of work includes creating (2) spec suites(1630 & 1650) demo of non structural interior partitons, doors, finishes, ceilings and lighting. new consruction includes non-s…
11/fl- ti demo (e) and build (n) partitions (non-structural) accoustical/ceiling, finishes, millwork (n) cafe
38th fl ref pa #2025-0530-7558: add a gender neutral restroom. relocate one wall to a conference room and add glazing to two office partitions.
deferred mep for pa#2025-1222-2376
suite 340- ti demo and (n) non structural partitions, finishes, millwork, lighting, no exterior work. mep deferred
existing cafe to be remodeled at ground floor. a new accessible toilet, all work is limited to inteiror of suite# 103 only. modify (e) partition walls. electrical and mechanical ex…
revisions to 202510227850 (ref permit 202409110535). revisions to proposed ev panel board increase from 1200a to 1600a.
arch, electrical, structural work in basement at (e) bike parking cage. relocate (e) fence & gate, new fence to match (e) including anchoring. install u shaped bike racks, new auto…
re-roofing: work at front uppder ledge roof and front canopy roof, remove 431 sq ft of existing roofing and dispose of property, install 431 sq ft of 1/4 inch fire rated board over…