751 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
751 permits
install 20 dual port level ev chargers - not for fleet charging - existing parking garage for dwelling units and commercial, level ii chargers
2nd fl - add 11, relocate 16 change out 3 fire sprinkler ti ref 202512020740
13/f suite 1300: add (12). relocate (15) fire sprinkler per ti. ref permit 202512171962.
7th floor: mechanical and electrical work for t.i. ref arch #202511200104
installation of 9 phone booths/ privacy pods in the fifth floor tenant space. any mep, fire sprinkler and life safety work permitted separateley.
7th floor: revision to pa#202511200104 to remove originally purposed drinking fountain, change layout of office 733, change copy room 729 to storage.
the installation of nine (9) evercharge ev002 48a wifi enabled ev chargers in parking area.
defferred exterior metal framing assocated with approved pa 202410173107.
demo and dispose existing old pole lights & wirings. install new ballard lights inside lawn area near existing. install new ballard lights in other areas of the lawn.
sign b: install (1) illuminated double faced projecting sign: "b&o est. 1925"
sign a: install (1) non-illuminated single faced wall sign: "bang & olufsen"
bathroom remodel like for like replace shower, sink, vanity, toilet, fan upgrade mep to code. 63 sqft kitchen remodel like for like. 72 sqft. unit 208
build back (27) units, (4) hallways, and (5) partial stairways, 1st level offices & commercial space. unit #14 build back to include drywall, insulation kitchen cabinet, kitchen co…
17/f: minor t.i. to make market ready: no occupancy at completion. future t.i. sep permit. renovations/upgrades to(e) restrooms.
24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vesti…
9th fl, ste 900 selective demo of int'r partitions, ceiling and lighting; new non-structuarl partitions, doors, frames, hardware and sidelights; new finishes, minor ceiling rework…
23/fl- expansion and modification of (e) ti to include demo and construction of non load bearing partitions, (n) ceiling grid and tile, (n) light fixtures, office doors/frames, pow…
2/fl- relocate (155) pendents due to (n) ceiling and wall configuration
to obtain final inspection for work approved uner pa# 202012181341. all work is complete.
7th floor. relocate (31) uprights. convert (23) uprights to pendents. convert (2) uprights the pendents. gcti# 202512030811