751 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
751 permits
ste, 1900 hvac modifications to support interior ti (e) central equipment to remain. (e) controls to remain. ref pa 202512030868
38/f: deferred mep for permit 202512101393.
#508: remove section of non-bearing wall between lr and br and add tempered glass panel and new pocket door. remove (e) door from lr to hall and add new swing door. no structural a…
7th fl - interior ti demo includes of non-structural partitions construction includes millwork, finishes, ceiling, mech & elec upgrades
6/f: meps for t.i. 202511250447.
11th fl - mep for pa 202511109302
ste: 1500 - revision to approved permit to modify layout of 2 gnrs and lactation room to fit (e) space. ref bpa: 202511109274
install (1) illuminated single faced wall sign: "jpmorgan chase" 19'x2'
19/f suite 1925: addition of 1 ceiling mounted strobe in suite 1925 due to tenant improvement. balance of system shall remain as is. ref t.i permit 202511149707
17th fl, ste 1750 - mech & elec work for ti ref pa 202601083478
unit#1312: one kitchen, one bathroom,remodel in kind like for like
demolition of interior/finishes, remove escalator system, work to be completed on 1st through forth floors.
1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting.
remove portions of the existing embarcadero fountain located in embarcadero plaza, including the precast concrete tube elements ("arms").
1st, 6th, & basement: alteration of a front of house into a catering nook to include construction of non-bearing partitions, finishes, door, frames and hardware. mep on seperate pe…
unit #1406: one kitchen, one bathroom. remodel in kind like for like.
unit #304: one kitchen, one bathroom. remodel in kind like for like.
unit #702: one kitchen, one bathroom. remodel in kind like for like.
tenant improvement on the 7th floor to include new non-structural partitions, acoustical ceiling, finishes, millwork, single user restroom. mep included.
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).