746 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
746 permits
34th floor: reference pa#202511179739. power, lighting, and signal title 24
7th/f interior t.i. elevator lobby, reception area, single offices, conferrence rooms, open office area, welless room, data/server, breakroom, mech, electrical & plumbing
rev to pa# 202501027602, ti interior common areas within (e) 31-story business occupancy bldg. revision notated as bulletins d & e, due to (e) field conditions & rfi/submittal resp…
structural revision on l32 at interconnecting stairs for pa #202507110624 and removal of special inspection item #4
unit #820/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer.
unit #1120/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer.
stair infill from floors 1-3 in vacant commercial building. new concrete floor infill & supporting structure at openings.
3rd fl- deferred electrical for pa #2025-1106-9032 & 2026-0127-4594
revision to pa #2025-0414-4331: removing deferred mechanical
19th fl: interior demo of non structural elements including but not limited to interior partitions, doors, finishes, ceiling, lighting, plumbing, mech & elec outlets and switches.…
verizon: remove (2) (e) antennas, (2)(e) rrus, (e) elec panel; relocate 9(e) rrus' and 1 transformer; install (n) 200a elec panel, 1 (n) cabinet, 8(n) batteries, (n) conduits.
title 24 energy compliant electrical drawings to be added to pa 202512030868
38/fl- ti of (e) office space including layout restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen or food service s…
put window for food delivery and to-go. food service sliding door installation.
level 40: tenant improvement including interior renovations for office layout, lobby, reception, meeting rooms and restrooms. mep deferred. no finish work, equipment or fixture ins…
3rd/fl- structural permit submittal to reinforce 3rd floor slab
28/f: t.i including interior renovation for employee cafe, restrooms and horizontal exit. dph approved under deferred permit. no finish work equipment or fixture installation in fo…
level 17: ti, demo of (e) & construction of (n) partitions, millwork, lighting, & finishes.
fire alarm t.i. to add 2 strobes only. ref pa#202508203469
revision to pa #2025-0527-7274 provide additional scope to previous permit: installation of (1) l2 dual hose charger and (2) l2 single hose chargers in valet only parking garage