746 issued permits in Financial District/South Beach, part of San Francisco, California. Refreshed every 6 hours from the city's public permit feed.
746 permits
24 & 25th floor; t.i. including interior renovations for office layout, restrooms and break area. dph approved under deferred permit. no finish work, equipment or fixture in micro…
27th/f: mep submittal for t.i. 202510207709
26/f: ti including renovations for office layout, restrooms, and break area. mep deferred. dph approved under deferred permit. no finish work, equipment or fixture in micro kitchen…
ste 2350 - selective demo & new construction of elements including but not limited to interior partitions, doors, finishes ceilins, mep & life safety under separate permits
this project involves demising one large suite into two smaller suites modification of an (e) t.i. to include demolition and construction of non-load bearing partitions, modificati…
interior tenant improvement 32nd fl. provide new accessible single use gender neutral restroom
floors 3,5,6,7 & 8 revision to pa #2025-1223-2562: modified restroom layout
rev202409040025 and deffered mep: arch changes-operable partition in multipurpose rm and removal of planters in basement lounge.relocate firewater pump to facilitage primign and ac…
18th floor: mep project. ref pa #202511048826
remodel of an (e) condo, including the removal of (e) and installation of new non structural walls, new light coves, new cabinetry, new interior doors, new outlets and new hvac ven…
suite 905: title 24 electrical lighting. ref t.i. pa202509185664.
#3000 int'r modifications to an existing auditorium, amc screen x projection technology, including installation of side-wall projection equipment; modifications to the existing scr…
4th fl - ref arch 202510288260 mep for project
flr: 32/33; fire only work for the partial area remodels on floor 32 and 33 done under pa#: 202510217760; 2 speakers/strobes are added and an existing one is relocated.
26/f: revision/deferred structural permit to #202507090436 (see page a1.26.
installing and anchoring 5 furniture phone booths on the 5th fl
fire alarm tenant improvement: add (2) ceiling speakers/strobes. add (1) ceiling speaker/strobes. arch ref pa# 2025-0610-8308.
2nd/f fire alarm revision to 202508153173: add 13 strobes only for phone booth
fire alarm as built for pa 201611162900 to include devices address on plan
fire alarm system upgrade: upgrade existing system to provide new & automatic fa system replacing the (e) control panel, utilizing both new & (e) devices, increase sound db levels…