Renovation Permits in San Francisco, California
4,008 renovation permits filed recently
4,008 permits
interior basement redmoel to eliminate wet bar. create new interior wall per plan to create one bedroom and new office per plans.
interior tenant improvement 32nd fl. provide new accessible single use gender neutral restroom
revision to pa #202501228791: t.i - enlarge (e) kitchen, add bar on 1/f, add ada accessible bathrooms on 1/f
swap out for existing ssp's for 4 new dry pendents ref#202512192276
new 2-story horizontal rear addition. new office and bathroom on 1/f. relocate kitchen and living from 2/f to 1/f. reconfig stairs, add master bedroom on 2/f.
revision to pa #2025-0917-5525: add to scope of work: remodel 1 bath and add sink to powder room
bathroom and laundry room remodeling, like for like.
replace 3 front windows- casement-fixed-casement with vinyl windows
replace 5 aluminum windows facing the street, and 6 non street facing, 11 window total: in kind in existing openings. change from aluminum to fiberglass. ufactor .27 max.
exterior dry rot repairs and stucco repairs. street visible, less than 50%. in kind
to comply with nov: 202200579- repair collision stucco damage to bldg wall, ceiling steel beam cover at post support. saw cut slab concrete, remove and replace slab, remove and replace one hss steel c...
1/f: add 2 bedroom, 2 full bath, office and family room. 2/f: remodel kitchen and bath, add 1.5 bath. 3/f: remodel bath.
exterior renovations. remove & replace deck coating on street facing side with westcoatsystem. remove & replace lap siding and cedar shingles associated with scope. sliding door is (e). install associ...
remove landing access existing stair. stair removed under seperate permit. infill door at kitchen not visible from street.
remove existing rear yard facing access stair. provide new guards at rear facing doors.
updating existing kitchen - tile floor, paint walls, replace 3 cabinets and stove
repair rear foundation at 904 rhode island.
rev to pa# 2025-0731-2097: 2nd fl. add foundtion to 2nd fl. walls
floors 3,5,6,7 & 8 revision to pa #2025-1223-2562: modified restroom layout
revision to bpa#202211075966, reconfigure front stair to basement adu and reconfigure from bath & utility room layout, relocate new steps @rear lightwell; replace interior posts and footings